Three-phase switchboard powering workshop machinery

Workshop Fitouts Victoria

Three-phase workshop power Victoria

Many workshop machines cannot be treated like standard plug-in equipment. CNC machines, compressors, hoists, fabrication equipment and industrial machinery may need three-phase power, dedicated circuits, isolators and suitable service routes.

Workshop Fitouts Victoria helps businesses across Victoria plan three-phase workshop power as part of broader machinery-ready fitouts.

We coordinate the power requirements with the workshop layout, equipment list, supplier input and future expansion needs.

Plan the supply around the equipment

The equipment list drives the power plan

Three-phase power planning should start with the equipment, not a guess. The machines, compressors, hoists and tools being installed will influence the circuits, service routes, switchboard allowances and staging of the fitout.

Workshop Fitouts Victoria helps review the equipment requirements early so the power plan supports the way the workshop will actually operate.

Common three-phase workshop equipment

CNC machines

Three-phase planning for CNC machinery where required by the equipment specifications.

Compressors

Power planning for suitable compressor systems and future workshop air demand.

Hoists

Service planning around hoist areas and vehicle workshop layouts.

Fabrication machinery

Power planning for fabrication, welding and production equipment.

Cabinetry machinery

Power planning for CNC routers, edgebanders and larger woodworking equipment.

Industrial equipment

Three-phase power planning for machinery-based industrial workshops.

Three-phase switchboard install with breakers and isolators

Connected to the wider fitout

Three-phase power is part of the full workshop plan

Power planning should work with lighting, compressed air, data, equipment layout, storage, access and supplier requirements.

Workshop Fitouts Victoria helps coordinate these items so three-phase power is not treated as a separate isolated job.

Three-phase power infrastructure feeding workshop machinery

FAQ

Common questions

Do all workshops need three-phase power?
No. It depends on the equipment. Some machinery requires three-phase power, while other equipment may not.
Can you review the equipment list first?
Yes. Reviewing the equipment list is the right starting point for three-phase workshop power planning.
Can three-phase power be included in a full workshop fitout?
Yes. Three-phase power can be coordinated as part of the broader workshop fitout.
Can finance help with equipment and setup costs?
Eligible customers may be able to explore third-party finance options for suitable equipment and fitout-related costs, subject to provider approval.

Need three-phase power for workshop machinery?

Book a site consult to review the equipment, site services and workshop layout before installation begins.

Prefer to talk first? Call 03 8572 1333